C/M Build Process. Manufacturing

 

C/M Prototyping. Fan - Speculator Alpha Romeo & C/M shared concept rendering on Sedans (above)






C/M BUILD PROCESS - MANUFACTURING

Prototype Testing

Part # + Material Choice

Final Part # + Material Choice (working model)

Duplicate molds & stockpiles from raw & repurposed material on hand for assembly using block 11 or equivlant

Block 11 will remain as reference to the NB-OT Labs & expansion Labs Holocaust modern using wBCI's 2012-2025 & priors leading up to

This includes Rechargers. Choice in approach then model with testing before final for production & testing

Digital + Physical testing


EMERGENCY SAFETY SYSTEM 

Safe controlled environments. Emergency Safety System voiding hazards 

In tests end results have to match design 


RECHARGERS 

Rechargers. Especially. Ensuring 2500+ Kw in under a 1/4 second repeatedly with 5-15+ year lifespan before review 

64,000-100,000 Bolt - Watts to Kw. 8 X 8 = 64 

We just barely contract & expand a large number of bolts repeatedly extracting usable Energy 

Perpetual Energy Motion & Idle

Domino's + all approaches integrated into H.I.3 & separate private

https://citythe22ndfirm.blogspot.com/2025/12/blog-post_26.html

"People have to have contained safe production model molds for assembly. No fu*king around" - Dr Sydney Nicola Bennett 


MAIN SHAREHOLDERS

2018-2025 Succesison & Restructure 

Main Shareholders 

Dr Carly Koslov Bennett & Dr Sydney Nicola Bennett control S.B.G - CIG + C/M 


CITY 

Comments

Popular posts from this blog

Sweet 16+. Dr Sydney Nicola Bennett

Adult Life + Rights & Decisions

Canadian Commodiites Audit